+90 (312) 939 86 92 Monday - Saturday 08:00 - 18:00 (GMT+3) Next Level A Blok Kat T No:3C1-160 Çankaya-Ankara, TR

PROTECT-A EPK 2K TEX

Epoxy resin based, two component, low-viscosity, solvent-free topcoat material

Technical Specifications

ColorRal colors
Storage temperature +5˚C to +25˚C
Packaging(comp. A + comp B)18 kg + 2 kg tin buckets
Shelf life(25˚C 55%RH)12 Months(Unopened)
Consumption0,3–0,5 kg/m² (paint application)
1,1–1,4 kg/m²/mm (self-levelling coating application)
Density1,55 ±0,05 gr/cm³
Mixing ratio9:1 (comp. A : comp. B)
Solid content%100
Mixture pot life (at 10˚C)80 minute
Mixture pot life (at 25˚C)30 – 35 minutes
Adhesion to concrete>1,5 N/mm²
Hardness (Shore D)75 – 80 (after 7 days)
Waiting time between layers8 – 12 hours
Waiting time till light use12- 24 hours
Full dry time7 days

Description

EPK 2K TEX is an epoxy resin based, two component, low-viscosity, solvent-free topcoat material that provides orange-peel textured surface.

Area of Use

  • On concrete and cement based mineral surfaces.
  • On medium and heavy wear industrial areas such as factories, storage halls, loading ramps etc.
  • On wet volume areas such as hospitals, laboratories, food industries etc.
  • On thermal and hydroelectric power plants.
  • On convention centers, car parks, shopping mall floors as non-slip floor materials.

Product Features and Advantages

  • Excellent adhesion performance.
  • Provides orange peel effect and anti-slip property.
  • Has excellent penetration ability.
  • Has hygiene and waterproofing properties.
  • Excellent chemical and mechanical strength.
  • Easy to apply.
  • Easy to clean.

Application Instructions

  • Existing surface must be clean, dry, flat and free of dirt, dust, oil, wax and mold.
  • All loose, dusty, cracked, crusted and pre-painted surfaces must be cleaned or scraped.
  • Component A and B should be mixed for at least 3-4 minutes with the help of a low-speed mixer until a homogeneous mixture is obtained.
  • The mixture should be consumed within 25-30 minutes.
  • 24 hours after the primer application, the application surface must be roughened by sanding.
  • In order to achieve the desired thickness on the application surface, the product should be spread with the help of a notched trowel and air should be taken with a spiked roller when the coating reaches the appropriate consistency.
  • The application should not be performed if the ambient temperature is below 10°C or above 30°C.
  • Avoid application in rainy and windy weather.
  • After the completion of the coating, the coating should be protected from water contact for at least 24 hours.
  • Thinning products should not be used with the product during the application.
  • Relative humidity should not exceed 80% during the application.

Leave us your info

Please fill in the form to request product samples or for your inquires and we will get back to you.

    Leave a Reply